Short answer. Estimate the minutes the job really takes, multiply by your hourly rate, add materials, then apply a minimum charge so that small jobs still pay. Quote one price before you start.

Alterations are the bread and butter of many tailors, but they are easy to underprice. A hem looks like ten minutes. Then you unpick the old hem, press, pin, sew, press again and the customer comes back to adjust it. This guide shows how to set prices that cover the whole job.

The rand amounts below are example figures to show the method. They are not market rates. Check what customers in your area pay, then set your own.

Use the free Sewing Pricing CalculatorTurn hours and materials into a price. No sign-up.

Why a flat price list can go wrong

A list that says "hem: R80" works until the trousers have a lining, a vent or jeans thread. Prices should come from time, not from the garment name. A list is fine for the plain version, as long as it says "from".

The method in five steps

Five steps to quote an alteration Look at the garment, estimate the time, multiply time by your hourly rate and add materials, apply your minimum charge, then quote and agree the price.1. Look at the garment2. Estimate the time3. Time x rate + materials4. Apply the minimum5. Quote and agree
The same five steps for every job, from a hem to a wedding dress.
  1. Look at the garment. Check the fabric, the lining, the seams and the construction before you quote. Jeans, leather and lined coats take longer.
  2. Estimate the time. Include unpicking, pressing, pinning, sewing and finishing. Add a fitting if the customer needs one.
  3. Time × rate + materials. Use your hourly rate. Add thread, a zip, or other parts you supply.
  4. Apply a minimum charge. Choose a floor price so a five minute job still pays for your travel, set-up and handling. Our example minimum is R50.
  5. Quote and agree. Say the price and when it will be ready. Do not start until the customer agrees.

Worked example with an hourly rate of R90

These times are examples for a plain garment. Your own times will differ, so time your next jobs and use those. Materials are set at R10 here as a small allowance for thread. A zip is extra.

JobTimeTime costQuote
Hem trousers (plain)0.5 hR45R55
Shorten sleeves (plain cuffs)1.5 hR135R145
Replace a zip1 hR90R100
Take in sides of a top1 hR90R100
Take in a dress (sides and waist)2 hR180R190

Quote = time cost + R10 thread, never lower than the R50 minimum. Add the cost of a zip or other parts you buy. Rush jobs and difficult fabric are extra.

The minimum matters. A 20 minute job is R30 at this rate, plus R10 thread, so the R50 minimum is what makes it worth the customer's trip.

Charge more when the job is harder

Keep a simple job log

After every job, write down the garment, the work done, the minutes it took and the price. After twenty jobs you will see which work pays and which loses you money. A hem you expected to take thirty minutes may take an hour. Update your price list from the log, not from guesswork.

When a customer asks for a discount

Policies that protect you

How to tell a customer your price

Say the price first, then the reason. For example: "A hem on lined trousers is R180. The lining has to be opened and closed again, so it takes about an hour and a half." Customers accept a clear reason. They push back when the price comes with no explanation.

Frequently asked questions

How much should I charge to hem trousers?

Estimate the time, multiply by your hourly rate and add thread. Use a minimum charge. See the table above for the method with example figures.

Should I charge per hour or per job?

Work it out per hour, then quote per job. A customer wants one number.

What should my minimum charge be?

Pick an amount that covers your set-up time and travel, even for a five minute job. Our example uses R50. Adjust it for your costs.

How do I price a job I have never done?

Do a test on a spare garment and time it. Then quote with the time you measured, plus a buffer.

Next steps